Ру Ўз O'z
Survey

News and announcements

14 September 2024

AJ «BIOKIMYO» announces the start of receiving applications for participation in the tender for the supply and installation of a turnkey solar power station On – GRID

AJ «BIOKIMYO» announces the start of receiving applications for participation in the tender for the supply and installation of a turnkey solar power station On – GRID

Brief TOR:
Required capacity of the SES – 100 kW,
Supplied set of equipment:
- Solar panels AstroEnergy 550W type: PERC+ / Multi-busar / Half-cut, Module efficiency: 21.3%;
- Inverter Huawei SUN2000-50KTL-M3;
- MC-4 connectors STAUBLI;
- Dongle 4G for system monitoring;
- ABB machines;
Provided design documentation:
- Design documentation for supporting metal structures with calculation of pressure on concrete floors and roof of the building at the SES installation site;
- Technical solution in PVsyst for solar radiation and climate data at the SPP installation site, with determination of solar energy potential, tilt and orientation of panels;
- 3D design of the roof project and location of solar panels;
- Linear and basic design diagram of the SPP;
Accompanying services and warranty service:
- Warranty from the official distributor for solar panels for 15 years and an inverter for 5 years;
- Technical maintenance of the SPP once a month during the calendar year;
- Calibration of equipment 15 days after the start-up of the SPP;

Standards, certificates and warranties:
- Solar panels and inverter with an available international warranty;
- International ISO and TUV certificate for solar panels and inverter;
- Availability of a certificate from the manufacturer for equipment installation;
- Dealer agreement with the supplier of solar panels and inverter;
- Confirmation letter of availability of all products in the warehouse with photographs;
- Financial statements for the last 2 years;
- Certificate of absence of debt to tax authorities;
- Confirmation of non-presence of the company in the register of unscrupulous performers;
- Letter of guarantee of non-presence of the company at the stage of reorganization, bankruptcy and liquidation;
- Information on the presence of at least 10 qualified employees with at least 3 years of experience in this field, from the website mehnat.uz;
- Supporting documents on experience in the supply and installation of solar power plants over 50 kW;
- Power of attorney from the manufacturer of the goods and an autorotation letter from the manufacturer;
- Inspection report of the solar power plant installation site;
- Availability of an agreement with a design organization licensed to design electrical networks.

Send applications for participation in the tender to the e-mail address info@biokimyo.uz

Click on the button below to listen to the text Powered by GSpeech